Les précautions d'installation des joints étanches des câbles de commande industriels sont les suivantes :
1. Before installing the industrial control cable waterproof connector, be sure to read the manufacturer's product manual carefully. This is especially important for 10KV and above cables. Think about all the processes before doing it.
2. Do not use too much force when pressing the copper pipe, as long as it is crimped in place, the copper end face after crimping is bound to have many raised points, this must be flattened with a file, and no burrs should be left.
3. The outer semiconductor shield is a semi-conductive material that acts as a uniform electric field outside the insulation of the cable and the joint. Like the inner semiconductor shield, it plays a very important role in the cable and the joint.
4. When making the joint, the inner shielding layer of the joint of the conductor part of the crimping tube must be restored, and a part of the inner semiconductor shield of the cable must be reserved, so that the inner shielding of the connector on the connecting tube can communicate with each other.
En résumé, il y aura de nombreuses précautions lors de l'installation de connecteurs étanches pour câbles de contrôle industriels. Par conséquent, il est préférable que le constructeur et l'utilisateur lisent attentivement le manuel d'usine et s'assurent qu'ils ne sont pas en train de le lire. Les problèmes que vous comprenez sont soulevés afin de les résoudre à temps, afin d'éviter le danger dans une certaine mesure.